Client:
EDL
Sectors:
Project Delivery
Capabilities:
Construct
Deliver
Design
Situation
Our client required an upgrade to the existing power generation facility to support increased demand for industrial and domestic use. Located in a remote, offshore environment, the logistics challenges were presented.
Solution
Aerison were engaged as the primary contractor to deliver engineering and design, fabrication and installation works for the following scope items:
- The acoustically treated and fire rated generator halls to house four (4) Wartsila W6L32 gensets allowing for future removal/installation of any of the gensets.
- Ventilation systems and engine exhaust systems including roof mounted mufflers.
- Structural, mechanical, piping, electrical and instrumentation works.
Particular Features:
- The enclosure was designed to provide a four-hour fire rating for all wall partitions
Project Highlights:
- Complete building, equipment and components were engineered and designed to be suitable for containerised transport.
- Complete project was delivered from Australia for assembly on Christmas Island.
- Equipment and components designed to withstand the harsh coastal environment conditions of Christmas Island.
- Individual generator halls supplied with filtered ventilation air and the electrical control room temperature-controlled air conditioning.
- Generator enclosure designed to meet strict noise requirements of 85 dB(A) sound pressure at 1m.
Outcome
- Design and construction activities were delivered safely with no reportable incidents.
- Reduced onsite construction activity through pre-assembly and modular build methods. Despite inclement weather conditions, the project was completed ahead of schedule within the allocated cost.